PROJECTS.

Interactive demos built by T.A.M.A.M Yazılım.

01 / 063D Experiences

ANKARA / 3D CITY MODEL

KIZILAY

Güvenpark, the square, and 400 surrounding buildings.

39.9195° N / 32.8540° E

Central Ankara,
a closer
look.

OPEN 3D MAP
KIZILAY / ÇANKAYA400BUILDINGS

Güvenpark
Kızılay Square
Business centre
Shopping centre

Map data: OpenStreetMap
Facades and missing heights are approximate.
Demo application
02 / 06Smart Systems

FARM MANAGEMENT

KÖK

Farm management and equipment monitoring.

KÖK/OSFARM 07
DEMO 08:30
About this demo

Uses sample data and is not connected to equipment. Irrigation, temperature, energy, feeding and vehicle movements are accelerated simulations. Other equipment values are fixed sample records.

Farm view
LOADING 3D MODEL · 0%FARM OVERVIEW / SELECT A FACILITY
DRAG / ROTATE+ − / ZOOMWALK MODE
Activity log

No activity yet.

1 ALERT
Demo application
03 / 063D Experiences

3D PRODUCT CATALOGUE

FORM/01

Explore industrial products from every angle.

FORM/01 · 3D PRODUCT VIEWER

Industrial sledgehammer

Steel head / wooden handle

Preparing 3D model…

DRAG / ROTATE + − / ZOOM

Model sources & licences
Demo application
04 / 06Software

VEHICLE ACCESS DEMO

EKSEN

Vehicle entries, access permissions, and barrier controls.

EKSENVEHICLE ACCESS CONTROL
Demo
CAMERA 01ENTRANCE A / SIMULATED VIEW
Preparing scene
09:42:00
Preparing vehicle and surroundings
01Vehicle detection
02Plate review
03Access check
04Barrier
Entrance A

Access scenario

Visitors and unreadable plates require operator approval.

Recent entries

0 vehicles

A record appears once the vehicle has fully passed the barrier.

About this demo

Fictional vehicles and plates use prepared recognition results. There is no live OCR, camera or barrier connection.

Demo application
05 / 06Mobile

MOBILE FIELD ASSISTANT

ROTA

Field tasks and maintenance records.

ROTA / FIELD TEAM

Field maintenance tracking.

About this demo

Sample facility and local record queue. Sync is simulated; location is not collected and photos are not uploaded. Records are cleared on reload.

ROTAFIELD OPERATIONSConnected
FACILITY PLAN3 STOPS · SAMPLE ROUTE
PUMPGREENHOUSEWORKSHOPSTORAGEOFFICEFACILITY SERVICE ROADN ↑
BAK-024 · STOP 1 / 3
Pump station

Pressure line and connection inspection

18 min. estimated maintenance · Pending
0 records queued
Demo application
06 / 06AI

DOCUMENT Q&A

AKIŞ

Find information in a document, with the relevant source paragraph.

AKIŞDOCUMENT WORKSPACE3 SAMPLE DOCUMENTS · DEMO
SAMPLE DOCUMENT

Project scope

1.1
Delivery scope

The first release includes a task list, inspection form and administration panel. Payment and accounting integrations are excluded.

1.2
Schedule

The plan allows 2 weeks for discovery and design, 4 weeks for development, and 1 week for testing and acceptance. The schedule starts after scope approval.

1.3
Acceptance

The client verifies task creation, checklist completion and record viewing. No critical defects may remain at acceptance.

1.4
Change control

New requests are assessed separately. Additional development begins only after the time and cost impact is approved in writing.

Ask about this document.

Example questions 28 questions
Project scope 15 questions
Conversation & help 13 questions

The answer and source paragraph will appear here.

About this demo

Uses prepared answers and is not connected to a language model. File uploads are not supported. Questions and review status remain in this session only.

Demo application

LET’S TALK
ABOUT YOUR PROJECT.

Get in touch